User:Tennis Dynamite/HPI, LLC
This is not a Wikipedia article: It is an individual user's work-in-progress page, and may be incomplete and/or unreliable. For guidance on developing this draft, see Wikipedia:So you made a userspace draft. Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
HPI, LLC new article content ...
Projects
HPI along with S&W Solutions is carrying out the Engineering, procurement and construction (EPC) for the third plant in the Takoradi Power Station in Ghana.[1] It will be a 132 MW combined cycle power plant. It will consist of four gas turbines, heat recovery steam generators and one steam turbine,from [Zorya-Mashproekt], the Ukrainian state gas turbine manufacturer, powered by a dual fuel source of light crude or natural gas. The plant will be operated by the Volta River Authority and will cost $185 million.[2]
References
- ^ "Magellan to build 132 MW gas-fired power plant in Ghana". Power Engineering. PennEnergy. 2010-01-25. Retrieved 2011-03-21.
- ^ "Takoradi Power Plant Expanded". Daily Guide. Modern Ghana Media Group. 2010-01-19. Retrieved 2011-02-12.