Jump to content

Perdekraal Wind Farm

Coordinates: 33°03′22″S 20°06′32″E / 33.056°S 20.109°E / -33.056; 20.109
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Caracal Rooikat (talk | contribs) at 08:12, 22 August 2022 (Created page with '{{short description|Wind farm in South Africa}} {{Infobox power station | name = Perdekraal Wind Energy Facility | name_official = | image = | image_size = | image_caption = | image_alt = | location_map_size = | location_map_caption = | coordinates = | country = South Africa | location = Witzenberg Municipality | status...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Perdekraal Wind Energy Facility
Map
CountrySouth Africa
LocationWitzenberg Municipality
Coordinates33°03′22″S 20°06′32″E / 33.056°S 20.109°E / -33.056; 20.109
StatusCommissioned
Construction beganNovember 2018
Commission date2021
Owner(s)BioTherm Energy, Letsatsi Trust
Operator(s)Mainstream
Wind farm
TypeOnshore
Power generation
Units operational48
Make and modelSiemens: Permanent Magnet Generator with Gearless Direct Drive Rotor 2.5 MW
Nameplate capacity
  • 107.76 MW

Main Sub-Contractors: Siemens Gamesa (Turbines), Concor & Conco (Construction)

The Perdekraal Wind Energy Facility is a wind farm in the Witzenberg Municipality, built in the Western Cape province of South Africa.

Planning and approval

The wind farm covers an area of 3055 hectares and was chosen because of its good wind conditions and proximity to national roads for wind turbine transportation. The wind farm formed part of the South Africa Renewable Energy Independent Power Producer Programme (REIPPP), and was awarded within the REIPPP bid window round 4.[1][2]

Funding and construction

The construction of the plant began in November 2018, and the wind farm achieved its first connection to the South African electrical grid on January 2021.[3]

Activation

When operating at full capacity, Perdekraal Wind Farm will generate around 368.8 GWh/year of clean renewable energy per year and is expected to supply electricity to power up to 111 118 South African homes.[4][5]

References

  1. ^ "Renewable IPPPP - Bid Window 4 Preferred Bidders" (PDF). Department of Energy, South Africa. Retrieved 6 January 2021.
  2. ^ https://www.engineeringnews.co.za/article/perdekraal-east-wind-farm-one-step-closer-to-achieving-commercial-operations-2020-10-08
  3. ^ https://perdekraaleastwind.co.za/perdekraal-wind-farm/overview/
  4. ^ https://www.mainstreamrp.com/insights/perdekraal-east-becomes-first-bw4-wind-farm-to-enter-operation/
  5. ^ https://www.polity.org.za/article/perdekraal-east-wind-farm-commences-commercial-operations-2020-10-09