Helsinki Metro: Difference between revisions

Content deleted Content added
No edit summary
Tags: Mobile edit Mobile web edit Advanced mobile edit
Line 197:
{{Main|Länsimetro}}
 
The decision to fund the construction of the second stage, from [[Matinkylä metro station|Matinkylä]] to [[Kivenlahti metro station|Kivenlahti]], was taken by the Espoo city council and the state of Finland in 2014. Construction began in late 2014. This stage of extension is {{convert|7|km|mi|1|abbr=on}} long and includes five new stations and a new depot in Sammalvuori. All of the track, including the depot, will be built in tunnels. The line is projected to openopened for passenger traffic inon the 3rd 3of December 2022.<ref>https://www.espoo.fi/fi/liikenne-ja-kadut/joukkoliikenne/lansimetro</ref>
 
===Eastern extension===