Network Rail: Difference between revisions

Content deleted Content added
succinct captions
I think it's fair to say this is not happening this year if ever
Tags: Mobile edit Mobile web edit Advanced mobile edit
 
(7 intermediate revisions by 5 users not shown)
Line 1:
{{short description|Rail company in Greatthe BritainUnited Kingdom}}
{{Distinguish|National Rail}}
{{Use British English|date=October 2012}}
Line 7:
| type = [[State-owned enterprise|Government-owned company]]/[[non-departmental public body]]<ref>{{cite web |url= http://www.networkrail.co.uk/about-us/governance/|title=Our legal and financial governance structure |publisher=Network Rail |url-status=live |archive-url= https://web.archive.org/web/20160511032631/http://www.networkrail.co.uk/about-us/governance/|archive-date=11 May 2016|df=dmy-all}}</ref><br><small>(incorporated as a [[Private company limited by guarantee|private company limited by guarantee without share capital]])</small>
| predecessor = [[Railtrack]]
| successor = [[Great British Railways]] (from 2024)
| foundation = {{Start date and age|2002|10|3|df=yes}}
| location = 1 Eversholt Street <br> [[London]] <br> NW1 2DN<ref>{{cite web |title=Contact us |url=https://www.networkrail.co.uk/communities/contact-us/ |website=Network Rail |access-date=8 December 2019}}</ref>
Line 25:
To cope with [[history of rail transport in Great Britain 1995 to date|rapidly increasing passenger numbers]], ({{as of|2021|lc=on}}) Network Rail has been undertaking a £38 billion [[History of rail transport in Great Britain 1995 to date#Timeline of improvements|programme of upgrades]] to the network, including [[Crossrail]], [[Railway electrification in Great Britain|electrification of lines]] and [[Thameslink Programme|upgrading Thameslink]].
 
In May 2021, the Government announced its intent to replace Network Rail in 2023 with a new public body called [[Great British Railways]].<ref name="GreatBritishRailways" /> In 2022 it was announced that Greatthis British Railwaysprocess would not replace Network Rail untilbe 2024delayed.<ref>{{Cite news |date=2022-10-19 |title=Great British Railways transport bill shelved |work=BBC News |url=https://www.bbc.com/news/uk-politics-63313823 |access-date=2022-11-26}}</ref>
 
==History==
Line 33:
[[Rail transport in Great Britain|Britain's railway system]] was built by private companies, but it was [[nationalisation|nationalised]] by the [[Transport Act 1947]] and run by [[British Rail]]ways until [[Privatisation of British Rail|re-privatisation]] which was begun in 1994 and completed in 1997.<ref>{{cite journal |url = https://www.socresonline.org.uk/7/1/strangleman.html |first = Tim |last = Strangleman |date = 2002 |title = Nostalgia for Nationalisation – the Politics of Privatisation |journal = Sociological Research Online |volume = 7 |number = 1 |pages = 92–105 |doi = 10.5153/sro.701 |s2cid = 144684740 }}</ref><ref name = "wolmar 2005">{{cite news |last = Christian |first = Wolmar |newspaper = [[The Guardian]] |date = 16 July 2005 |url = https://www.theguardian.com/comment/story/0,3604,1529802,00.html |title = Forget Byers: the scandal was in the original sell-off: Railtrack was heading for disaster long before the Hatfield crash}}</ref> As a part of the privatisation process, the railway infrastructure, passenger and freight services were separated into separate organisations. Between 1994 and 2002, the infrastructure was owned and operated by [[Railtrack]], a privately-owned company.<ref name = "parliament summary2010">{{cite web |url = https://researchbriefings.files.parliament.uk/documents/SN01224/SN01224.pdf |title = Railways: Railtrack, 1994-2002 |date = 24 March 2010 |website = parliament.uk |first = Louise |last = Butcher}}</ref><ref name = "Edmondreplace independent1997">{{cite news |url = https://www.independent.co.uk/news/business/beleaguered-railtrack-seeks-big-hitter-to-replace-edmonds-1257605.html |title = Beleaguered Railtrack seeks 'big hitter' to replace Edmonds |newspaper = The Independent |first1 = Sameena |last1 = Ahmad |first2 = Andrew |last2 = Yates |date = 22 June 1997}}</ref>
 
A spate of accidents, including the [[Southall rail crash]] in 1997<ref>{{cite news |url = http://news.bbc.co.uk/onthisday/hi/dates/stories/september/19/newsid_2524000/2524283.stm |title = Six dead in Southall Train Disaster |work = BBC News |date = 19 September 1997}}</ref> and the [[Ladbroke Grove rail crash]] in 1999<ref>{{cite news |url = http://news.bbc.co.uk/1/hi/uk/467919.stm |title = Ladbroke Grove Crash |work = BBC News |date = 11 October 1999}}</ref> called into question the negative consequences that the fragmentation of the railway network had introduced to both safety and maintenance procedures. Railtrack was severely criticised for both its performance for infrastructure improvement and for its safety record.<ref name = "parliament summary2010"/><ref>{{cite journal |url = https://www.tandfonline.com/doi/abs/10.1080/00036840903476379?journalCode=raec20 |title = The rise and fall of Railtrack PLC: an event study |journal = Applied Economics |volume = 43 |date = 2011 |issue = 23 |pages = 3143–3153|doi = 10.1080/00036840903476379 |last1 = Glass |first1 = Anthony |s2cid = 154603770 }}</ref> The [[Hatfield train crash]] on 17 October 2000 was a defining moment in the collapse of Railtrack.<ref>{{cite news |url = http://news.bbc.co.uk/onthisday/hi/dates/stories/october/17/newsid_2491000/2491425.stm |title = Four dead in Hatfield Train Crash |work = BBC News |date = 17 October 2000 |url-status = live |archive-url = https://web.archive.org/web/20080307134427/http://news.bbc.co.uk/onthisday/hi/dates/stories/october/17/newsid_2491000/2491425.stm |archive-date = 7 March 2008 |df = dmy-all}}</ref> The immediate major repairs undertaken across the whole British railway network were estimated to have cost in the order of [[Pound sterling|£]]580 million and Railtrack had no idea how many more 'Hatfields' were waiting to happen because it had lost considerable in-house engineering skill following the sale or closure of many of the engineering and maintenance functions of [[British Rail]] to external companies; nor did the company have any way of assessing the consequence of the speed restrictions it was ordering. These restrictions brought the railway network to an almost total standstill and drew significant public ire.<ref name = "timeline guardian2002">{{cite news |url = https://www.theguardian.com/world/2002/jun/27/transport.uk |title = Timeline: Railtrack |newspaper = The Guardian |first1 = Mark |last1 = Tran |first2 = Sarah |last2 = Left |first3 = Philip |last3 = Pank |date = 27 June 2002}}</ref><ref>{{cite news |url = https://www.telegraph.co.uk/news/1482439/Hatfield-crash-was-disaster-waiting-to-happen.html |title = Hatfield crash "was disaster waiting to happen" |newspaper = [[The Daily Telegraph]] |date = 31 January 2005 |access-date = 22 August 2016 |archive-date = 10 February 2018 |archive-url = https://web.archive.org/web/20180210181641/http://www.telegraph.co.uk/news/1482439/Hatfield-crash-was-disaster-waiting-to-happen.html |url-status = live}}</ref><ref>{{cite news |url = http://news.bbc.co.uk/2/hi/uk_news/scotland/989218.stm|title=Railtrack shuts down West Coast Main Line |work = BBC News |date = 25 October 2000 |url-status = live |archive-url = https://web.archive.org/web/20131110021218/http://news.bbc.co.uk/2/hi/uk_news/scotland/989218.stm|archive-date = 10 November 2013 |df = dmy-all}}</ref> According to railway historian [[Christian Wolmar]], Railtrack's board panicked in the wake of Hatfield.<ref>{{cite book |last = Wolmar |first = Christian |title = On the Wrong Line |publisher = Aurum Press |date = 2005 |isbn = 978-1-85410-998-9|url=https://books.google.com/books?id=HSMzj9wC_soC&pg=PT290|page=290|via=Google Books}}</ref> Railtrack's first chief executive, John Edmonds, had pursued a deliberate strategy of [[outsource|outsourcing]] engineers' work wherever possible with the goal of reducing costs.<ref name = "Edmonds obituarytelegraph">{{cite news |url = https://www.telegraph.co.uk/obituaries/2020/05/27/john-edmonds-executive-forced-radical-changes-british-rail/ |title = John Edmonds, executive who forced through radical changes at British Rail – obituary |newspaper = The Telegraph |date = 27 May 2020}}</ref>
Various major schemes being undertaken by Railtrack had also gone awry. The modernisation of the [[West Coast Main Line]] had suffered from spiralling costs, rising from an estimated £2 billion to roughly £10 billion.<ref>{{cite news |url = http://news.bbc.co.uk/1/hi/uk/565507.stm |title = Repair costs spiral to £5bn |work = BBC News |date = 15 December 1999 |url-status = live |archive-url = https://web.archive.org/web/20131110021245/http://news.bbc.co.uk/2/hi/uk_news/565507.stm |archive-date = 10 November 2013 |df = dmy-all}}</ref> This programme suffered failures that were technical as well as managerial, such as the [[moving block]] signalling apparatus being immature for such a busy mixed-traffic mainline.<ref>{{cite news |url = https://www.theguardian.com/politics/2004/apr/01/transport.uk |title = The main players in the £10bn rail fiasco |newspaper = The Guardian |first = James |last = Meek |date = 1 April 2004 }}</ref><ref>{{Cite web |title = The Modernisation of the West Coast Main Line |url = https://www.nao.org.uk/report/the-modernisation-of-the-west-coast-main-line/ |access-date = 21 July 2021 |website = [[National Audit Office (United Kingdom)|National Audit Office]] |date = 22 November 2006 |archive-date = 21 July 2021 |archive-url = https://web.archive.org/web/20210721150856/https://www.nao.org.uk/report/the-modernisation-of-the-west-coast-main-line/ |url-status = live}}</ref> In 2000, reports emerged that Railtrack may not be able to go through with its planned commitment to purchase section 2 of [[High Speed 1]], resulting in disruption and uncertainty for that programme as well.<ref>{{cite news |url = https://www.theguardian.com/business/2000/may/30/7 |title = Railtrack funding of Channel rail link in doubt again |first = Keith |last = Harper |date = 30 May 2000 |newspaper = The Guardian |access-date = 1 August 2009 |location = London |archive-date = 8 May 2014 |archive-url = https://web.archive.org/web/20140508231457/http://www.theguardian.com/business/2000/may/30/7 |url-status = live }}</ref><ref>{{cite news |url = https://www.independent.co.uk/news/uk/home-news/railtrack-could-ditch-new-channel-rail-link-702632.html |archive-url = https://web.archive.org/web/20091201134427/http://www.independent.co.uk/news/uk/home-news/railtrack-could-ditch-new-channel-rail-link-702632.html |url-status = dead |archive-date = 1 December 2009 |title = Railtrack could ditch new Channel rail link |first = Michael |last = Harrison |date = 16 January 2001 |newspaper = The Independent |access-date = 1 August 2009 |location = London}}</ref><ref>{{cite news |url = https://www.independent.co.uk/news/uk/home-news/railtrack-to-lose-its--newline-monopoly-689651.html |title = Railtrack to lose its new-line monopoly |first = Colin |last = Brown |date = 1 April 2001 |newspaper = The Independent |access-date = 1 August 2009 |location = London}}{{dead link|date=August 2021|bot=medic}}{{cbignore|bot=medic}}</ref>
Line 128:
{{col-end}}
 
Glasgow Central and Liverpool Lime Street stations are divided into high and low-level stations – the high-level stations are all termini used primarily by the main inter-city services to those stations. The low-level stations are through routes on local commuter networks that are largely separate from other routes to the main station; these platforms are not managed by Network Rail, but instead by the rail operator that primarily uses them, ([[ScotRail]] and [[Merseyrail]] respectively).{{Citation needed|date=February 2021}}
 
Network Rail operated {{rws|Gatwick Airport}} station until January 2012 when it was transferred to [[Southern (train operating company)|Southern]], and {{rws|Fenchurch Street}} until November 2014 when it was transferred to [[c2c]]. Network Rail took over management of Bristol Temple Meads and Reading in April 2014.<ref>{{Cite web |title=Railnews: Royal opening for modernised Reading |url= http://www.railnews.co.uk/news/2014/07/17-royal-opening-for-modernised-reading.html |date=July 2014 |access-date=22 December 2014 |url-status=live |archive-url= https://web.archive.org/web/20150403012204/http://www.railnews.co.uk/news/2014/07/17-royal-opening-for-modernised-reading.html |archive-date=3 April 2015 |df=dmy-all}}</ref>
Line 203:
<gallery>
File:2009 at Fairwater crane 96715.JPG|Breakdown crane
File:Switch_and_Crossing_Rail_Grinder_DR79261_and_DR79271Switch and Crossing Rail Grinder DR79261 and DR79271.jpg|[[Railgrinder]] for switches and crossings
File:Tamworth railway station MMB 27 43062.jpg|[[New Measurement Train]]
File:DR 98931 Tonbridge to Tonbridge (22476971424).jpg|Railhead treatment train
File:Didcot - Network Rail DR80211 (66005).JPG|[[Stoneblower]] at {{stnlnk|Didcot}}
File:Class 37 97302.jpg|[[British Rail Class 97|Class 97/3]] Locomotive for [[ERTMS in Great Britain|ERTMS]] Testing purposes.
</gallery>
 
Line 811 ⟶ 812:
* [[Northern Ireland Railways]]
* [[Financing of the rail industry in Great Britain]]
* [[Network Rail Certification Body]]
 
==References==