The '''''Swift'' Green Line''' is a [[bus rapid transit]] route in [[Snohomish County, Washington|Snohomish County]], [[Washington (state)|Washington]], United States, part of the [[Swift Bus Rapid Transit|Swift]] network operated by [[Community Transit]]. It was opened in 2019 and travels {{convert|12.5|mi|km}} along Airport Way and [[Washington State Route 527|State Route 527]], connecting 32 stations in the cities of [[Everett, Washington|Everett]], [[Mill Creek, Washington|Mill Creek]], and [[Bothell, Washington|Bothell]].
The Green Line was proposed in 2013 and began construction in July 2017. It cost $73 million to construct and opened on March 24, 2019.
|