Swift Green Line: Difference between revisions

Content deleted Content added
Undid revision 889552706 by TransitRider (talk) No need to change termini (mobileUndo)
Tags: Undo Mobile edit Mobile web edit
m Replace "Its termini are" with "The route starts at the" and add "ends at the" between the words "and" & "Cayon". The status is "In service".
Line 11:
|garage =
|vehicle =
|status = In developmentservice
|open = March 24, 2019
|predecessors = Community Transit route 105
Line 31:
}}
 
The '''''Swift'' Green Line''' is a [[bus rapid transit]] route in [[Snohomish County, Washington|Snohomish County]], [[Washington (state)|Washington]], United States, part of the [[Swift Bus Rapid Transit|Swift]] network operated by [[Community Transit]]. It was opened in 2019 and travels {{convert|12.5|mi|km}} along Airport Way and [[Washington State Route 527|State Route 527]], connecting 32 stations in the cities of [[Everett, Washington|Everett]], [[Mill Creek, Washington|Mill Creek]], and [[Bothell, Washington|Bothell]]. ItsThe terminiroute arestarts at the Seaway Transit Center, adjacent to the [[Boeing Everett Factory|Boeing factory]], and ends at the Canyon Park Park and Ride on [[Interstate 405 (Washington)|Interstate 405]]; the Green Line also intersects the [[Swift Blue Line|Blue Line]] in Everett and also serves [[Paine Field]].
 
The Green Line was proposed in 2013 and began construction in July 2017. It cost $73 million to construct and opened on March 24, 2019.