Jump to content

Tom Lantos Tunnels: Difference between revisions

Coordinates: 37°34′38″N 122°30′45″W / 37.5772°N 122.5125°W / 37.5772; -122.5125
From Wikipedia, the free encyclopedia
Content deleted Content added
Apg520 (talk | contribs)
m Completion of tunnels now in past, not future
m Disambiguating links to Right of way (disambiguation) (link changed to Right-of-way (property access)) using DisamAssist.
 
(34 intermediate revisions by 25 users not shown)
Line 1: Line 1:
{{Short description|Tunnels}}
{{Infobox tunnel
{{Infobox tunnel
|name = Tom Lantos Tunnels
|name = Tom Lantos Tunnels
|image = The bridge to the tunnel at Devil's slide area.JPG
|image = Looking back at south entrances for Devil's Slide tunnel for the cars and trucks (21502830958).jpg
|image_size =
|image_size =
|caption = Northbound tunnel entrances
|caption = The construction of the North Portal Bridges leading to the tunnels, that bypass [[Devil's Slide (California)|Devil's Slide]]
|location = Near [[Pacifica, California]]
|location = Near [[Pacifica, California]]
|coordinates = {{coord|37.5772|-122.5125|region:US-CA_type:landmark|display=it}}
|coordinates = {{coord|37.5772|-122.5125|region:US-CA_type:landmark|display=it}}
Line 10: Line 11:
|start =
|start =
|end =
|end =
|startwork = 6 May 2005
|startwork = May 6, 2005
|open = 26 March 2013
|opened = March 26, 2013
|owner = State of California
|owner = State of California
|operator = Caltrans
|operator = [[California Department of Transportation|Caltrans]]
|traffic = Automotive
|traffic = Automotive
|character =
|character =
|vpd = <!-- Vehicles per day -->
|vpd = <!-- Vehicles per day -->
|construction = 2005-2013
|construction = 2005–2013
|length = 4,149 ft (northbound)<br>4,008 ft (southbound)
|length = 4,149 ft (northbound)<br>4,008 ft (southbound)
|lanes = 1 per bore
|lanes = 1 per bore
|speed = {{convert|45|mph|abbr=on}}
|speed = {{convert|45|mph|abbr=on}}
|hielevation = c. {{convert|20|m|abbr=on}} msl
|hielevation = c. {{convert|30|m|abbr=on}} msl
|lowelevation = c. {{convert|30|m|abbr=on}} msl
|lowelevation = c. {{convert|20|m|abbr=on}} msl
|height = {{convert|6.8|m|abbr=on}}
|height = {{convert|6.8|m|abbr=on}}
|width = {{convert|9|m|abbr=on}}
|width = {{convert|9|m|abbr=on}}
|grade =
|grade =
|map = {{maplink|frame=yes|plain=yes|frame-align=center|frame-width=290|zoom=14|type=point}}
}}
}}
The '''Tom Lantos Tunnels''' are two tunnels located within the coastal [[promontory]] of [[Montara Mountain]], on the San Francisco Peninsula in [[California]], United States, created to allow rerouting [[California State Route 1|State Route 1]] to avoid a portion of roadway known as [[Devil's Slide (California)|Devil's Slide]]. They are officially named after late Congressman [[Tom Lantos]], who was instrumental in securing funding for the project, but ''[[de facto]]'' named after their location.


The '''Devil's Slide tunnels''', as they are usually called, are the second and third longest road tunnels in California at {{convert|4149|ft|abbr=on}} northbound, and {{convert|4008|ft|abbr=on}} southbound. By comparison the longest road tunnel currently in California, the [[Wawona Tunnel]] on Highway 41 in Yosemite National Park, is {{convert|4233|ft|abbr=on}}.
The '''Tom Lantos Tunnels''' are two tunnels located within the coastal [[promontory]] of [[Devil's Slide (California)|Devil's Slide]] in [[California]], United States, allowing [[California State Route 1|State Route 1]] to bypass the treacherous Devil's Slide stretch. They are named after late Congressman [[Tom Lantos]], who was instrumental in securing funding for the project.


==History of the highway rebuilding conflict==
==History==
[[File:TLT P6226891A solstice 20130622 (14337744067).jpg|thumb|Interior of the tunnels]]
A bypass was proposed to be constructed to replace the {{convert|600|ft|m|adj=mid}} stretch of highway. Beginning in 1958, California began the process to replace Devil's Slide with an inland route over [[Montara Mountain]], known as the [[Martini Creek Bypass]]. The bypass bisected a section of [[McNee Ranch State Park]], and was opposed by community and environmental groups. By 1975, 55% of the [[Easement|right-of-way]] had been acquired, when work on the proposed bypass was abandoned due to public opposition.


A bypass was proposed to be constructed to replace the {{convert|600|ft|m|adj=mid}} stretch of highway. Beginning in 1958, California began the process to replace Devil's Slide with an inland route over [[Montara Mountain]], known as the [[Martini Creek Bypass]]. The bypass bisected a section of [[McNee Ranch State Park]], and was opposed by community and environmental groups. By 1975, 55% of the [[Right-of-way (property access)|right-of-way]] had been acquired, when work on the proposed bypass was abandoned due to public opposition.
Most environmentalists supported a [[tunnel]] as a more environmentally sensitive alternative to the [[Martini Creek]] Bypass. A short tunnel built in 1908 by the [[Ocean Shore Railroad]] went through the area, but was destroyed during [[Prohibition]], to keep it from being used by [[alcoholic beverage|alcohol]] [[rum-running|smugglers]]. The [[Sierra Club]] proposed building a tunnel to bypass the road in 1973. A [[California Department of Transportation|Caltrans]] study in 1974 determined that a tunnel would be a viable alternative to the current road or a proposed inland [[freeway]] bypass. However, the state dropped the idea in the late 1970s.

Most environmentalists supported a [[tunnel]] as a more environmentally sensitive alternative to the [[Martini Creek]] Bypass. A short tunnel built in 1908 by the [[Ocean Shore Railroad]] went through the area, but was destroyed during [[Prohibition in the United States|Prohibition]], to keep it from being used by [[alcoholic beverage|alcohol]] [[rum-running|smugglers]]. The [[Sierra Club]] proposed building a tunnel to bypass the road in 1973. A [[California Department of Transportation|Caltrans]] study in 1974 determined that a tunnel would be a viable alternative to the current road or a proposed inland [[freeway]] bypass. However, the state dropped the idea in the late 1970s.


[[File:Devil's slide rockfall, which closed Route 1 for 5 months.jpg|thumb|right|10%|SlideCaltrans photo from Pacific Ocean of road failure]]
A major slide in 1983 brought the problem to the public attention again. In 1985 Caltrans proposed the Martini Creek bypass as the preferred solution. However, the Sierra Club sued to stop construction, as California law requires that State Route 1 be restricted to two lanes in [[rural]] areas. The {{convert|101|ft|m|adj=mid|-wide}} road bed, complete with continuous uphill [[passing lane]]s, runaway truck ramps, and extra-wide shoulders, would be the widest two-lane road in the state. Again the state decided to return to the status quo.
A major slide in 1983 brought the problem to the public attention again. In 1985 Caltrans proposed the Martini Creek bypass as the preferred solution. However, the Sierra Club sued to stop construction, as California law requires that State Route 1 be restricted to two lanes in [[rural]] areas. The {{convert|101|ft|m|adj=mid|-wide}} road bed, complete with continuous uphill [[passing lane]]s, runaway truck ramps, and extra-wide shoulders, would be the widest two-lane road in the state. Again the state decided to return to the status quo.


[[File:Devil's Slide Tunnel Entrance-aerial.jpg|thumb|left|10%|Aerial view of tunnel under construction as a bypass at Devil's ]]
A five-month outage caused by a slide in January 1995 again brought public scrutiny to the stretch of highway. In April, Caltrans documents were discovered that showed the agency had intentionally overestimated the costs of a tunnel, to support the freeway bypass. In July, the [[Federal Highway Administration]] ordered Caltrans to re-evaluate a tunnel to bypass Devil's Slide. On November 5, 1996, San Mateo County voters approved [[San Mateo County Measure T (1996)|Measure T]] by 76%, changing the county's stated preference from construction of the bypass to construction of a tunnel. On November 9, Caltrans changed its position, supporting a bridge and tunnel as the best environmental, economic, and popular alternative to Devil's Slide.
A five-month outage caused by a slide in January 1995 again brought public scrutiny to the stretch of highway. In April, Caltrans documents were discovered that showed the agency had intentionally overestimated the costs of a tunnel, to support the freeway bypass. In July, the [[Federal Highway Administration]] ordered Caltrans to re-evaluate a tunnel to bypass Devil's Slide. On November 5, 1996, San Mateo County voters approved [[San Mateo County Measure T (1996)|Measure T]] by 76%, changing the county's stated preference from construction of the bypass to construction of a tunnel. On November 9, Caltrans changed its position, supporting a bridge and tunnel as the best environmental, economic, and popular alternative to Devil's Slide.


Ground was broken for the new tunnel on May 6, 2005. Boring of twin {{convert|30|ft|m|0|adj=on}} diameter tunnels started September 17, 2007, and was completed in 2011.<ref>{{cite news | author=Michael Cabanatuan| title=Devil's Slide tunnel work falls behind schedule | url=http://www.sfgate.com/bayarea/article/Devil-s-Slide-tunnel-work-falls-behind-schedule-2336430.php | work=The San Francisco Chronicle | date=Thursday, 4 August 2011 | accessdate=21 March 2013}}</ref> Breakthrough on the northern bore occurred on September 30, 2010.<ref>{{cite news | author=Lily Bixler | title=Workers break through tunnel preemptively | url=http://www.hmbreview.com/articles/2010/09/30/news/breaking_news/doc4ca4ce0671ef9926663919.txt | work=The Half Moon Bay Review | date=Tuesday, 14 February 2012 | accessdate=21 March 2013}}</ref> With the completion of the tunnels in 2013, the old Devil's Slide highway will be converted into a trail for hikers and bicyclists.<ref>{{cite news | author=Ryan Kim | title=SAN MATEO COUNTY / Tunnel was devil of a fight / Caltrans breaks ground today on long-sought bypass at notorious slide | url=http://sfgate.com/cgi-bin/article.cgi?file=/c/a/2005/05/06/BAGC8CL3OQ1.DTL | work=The San Francisco Chronicle | date=Friday, May 6, 2005 | accessdate=21 March 2013}}</ref>
Ground was broken for the new tunnel on May 6, 2005. Boring of twin {{convert|30|ft|m|0|adj=on}} diameter tunnels started September 17, 2007, and was completed in 2011.<ref>{{cite news | author=Michael Cabanatuan| title=Devil's Slide tunnel work falls behind schedule | url=http://www.sfgate.com/bayarea/article/Devil-s-Slide-tunnel-work-falls-behind-schedule-2336430.php | work=The San Francisco Chronicle | date=4 August 2011 | accessdate=21 March 2013}}</ref> Breakthrough on the northern bore occurred on September 30, 2010.<ref>{{cite news | author=Lily Bixler | title=Workers break through tunnel preemptively | url=http://www.hmbreview.com/articles/2010/09/30/news/breaking_news/doc4ca4ce0671ef9926663919.txt | work=The Half Moon Bay Review | date=14 February 2012 | accessdate=21 March 2013}}</ref> With the completion of the tunnels in 2013, the old Devil's Slide highway was converted into a [[Devil's Slide Trail|trail]] for hikers and bicyclists.<ref>{{cite news | author=Ryan Kim | title=SAN MATEO COUNTY / Tunnel was devil of a fight / Caltrans breaks ground today on long-sought bypass at notorious slide | url=http://sfgate.com/cgi-bin/article.cgi?file=/c/a/2005/05/06/BAGC8CL3OQ1.DTL | work=The San Francisco Chronicle | date=May 6, 2005 | accessdate=21 March 2013}}</ref> The tunnels opened to traffic on March 26, 2013.<ref name=Mendoza>{{cite news|author=Michael Cabanatuan| title=Devil's Slide Tunnel to open March 26 |url=http://www.sfgate.com/bayarea/article/Devil-s-Slide-Tunnel-to-open-March-26-4352830.php | work=The San Francisco Chronicle | date=14 March 2013 |accessdate=21 March 2013}}</ref>

The Devil's Slide tunnels are the second and third longest road tunnels in California at {{convert|4149|ft|abbr=on}} northbound, and {{convert|4008|ft|abbr=on}} southbound. By comparison the longest road tunnel currently in California, the [[Wawona Tunnel]] on Highway 41 in Yosemite National Park, is {{convert|4233|ft|abbr=on}}.

The tunnels opened to traffic on March 26, 2013.<ref name=Mendoza>{{cite news|author=Michael Cabanatuan| title=Devil's Slide Tunnel to open March 26 |url=http://www.sfgate.com/bayarea/article/Devil-s-Slide-Tunnel-to-open-March-26-4352830.php | work=The San Francisco Chronicle | date=Thursday, 14 March 2013 |accessdate=21 March 2013}}</ref>

{{-}}


==References==
==References==
{{Reflist}}
{{Reflist}}

==Further reading ==
==Further reading ==
* Michael Hogan and Ballard George, ''Air Quality and [[Roadway noise|Noise]] Analyses for the Bypass Alternative, Devil's Slide Improvement Project'', [[Caltrans]] District 4, prepared by Earth Metrics Inc., [[Burlingame, California|Burlingame]], CA (1984)
* Michael Hogan and Ballard George, ''Air Quality and [[Roadway noise|Noise]] Analyses for the Bypass Alternative, Devil's Slide Improvement Project'', [[Caltrans]] District 4, prepared by Earth Metrics Inc., [[Burlingame, California|Burlingame]], CA (1984)
* ''Devil's Slide Improvement Project, [[San Mateo County]], California, Draft Second Supplemental [[Environmental Impact Statement]]'', [[Caltrans]] District 4 (1999)
* ''Devil's Slide Improvement Project, [[San Mateo County]], California, Draft Second Supplemental [[Environmental Impact Statement]]'', [[Caltrans]] District 4 (1999)
* Hovland, John H., Ph.D., P.E., ''A Study of the Feasibility of Stabilizing the [[Landslide]] Area Along Highway One, San Mateo County, California, by Dewatering'', April, 1998
* Hovland, John H., Ph.D., P.E., ''A Study of the Feasibility of Stabilizing the [[Landslide]] Area Along Highway One, San Mateo County, California, by Dewatering'', April, 1998
* Woodward-Clyde Consultants, ''Devil’s Slide [[Tunnel]] Study - Feasibility Report'', October, 1996.
* Woodward-Clyde Consultants, ''Devil’s Slide [[Tunnel]] Study Feasibility Report'', October, 1996.


==External links==
==External links==
{{Commons category|Tom Lantos Tunnels}}
{{wikisource|In Celebration of the Completion of the Bridges at Devil's Slide}}
{{wikisource|In Celebration of the Completion of the Bridges at Devil's Slide}}
* [http://www.dot.ca.gov/hq/esc/geotech/geo_design/geo_design_west/west.html Caltrans Office of Geotechnical Design West] engineering analysis
* [http://www.dot.ca.gov/hq/esc/geotech/geo_design/geo_design_west/west.html Caltrans Office of Geotechnical Design West] engineering analysis
* [http://www.dot.ca.gov/dist4/dslide/ Caltrans page for the Devil's Slide tunnel project]
* [http://www.dot.ca.gov/dist4/dslide/ Caltrans page for the Devil's Slide tunnel project]
* [http://www.tunnel.org/ Yes on T site]
* [http://www.tunnel.org/ Yes on T site]
* [http://www.flickr.com/photos/kqedquest/sets/72157600031882138/ KQED QUEST photo montage and article on tunnel]
* [https://www.flickr.com/photos/kqedquest/sets/72157600031882138/ KQED QUEST photo montage and article on tunnel]

{{Bay Area tunnels}}


[[Category:Buildings and structures in San Mateo County, California]]
[[Category:Transportation buildings and structures in San Mateo County, California]]
[[Category:Pacifica, California]]
[[Category:Pacifica, California]]
[[Category:Tunnels in the San Francisco Bay Area]]
[[Category:Tunnels in the San Francisco Bay Area]]
[[Category:California State Route 1]]
[[Category:California State Route 1]]
[[Category:Road tunnels in California]]

Latest revision as of 10:19, 15 May 2024

Tom Lantos Tunnels
Northbound tunnel entrances
Overview
LocationNear Pacifica, California
Coordinates37°34′38″N 122°30′45″W / 37.5772°N 122.5125°W / 37.5772; -122.5125
StatusComplete
Route SR 1 (Cabrillo Highway)
Operation
Work begunMay 6, 2005
Constructed2005–2013
OpenedMarch 26, 2013
OwnerState of California
OperatorCaltrans
TrafficAutomotive
Technical
Length4,149 ft (northbound)
4,008 ft (southbound)
No. of lanes1 per bore
Operating speed45 mph (72 km/h)
Highest elevationc. 30 m (98 ft) msl
Lowest elevationc. 20 m (66 ft) msl
Tunnel clearance6.8 m (22 ft)
Width9 m (30 ft)
Route map
Map

The Tom Lantos Tunnels are two tunnels located within the coastal promontory of Montara Mountain, on the San Francisco Peninsula in California, United States, created to allow rerouting State Route 1 to avoid a portion of roadway known as Devil's Slide. They are officially named after late Congressman Tom Lantos, who was instrumental in securing funding for the project, but de facto named after their location.

The Devil's Slide tunnels, as they are usually called, are the second and third longest road tunnels in California at 4,149 ft (1,265 m) northbound, and 4,008 ft (1,222 m) southbound. By comparison the longest road tunnel currently in California, the Wawona Tunnel on Highway 41 in Yosemite National Park, is 4,233 ft (1,290 m).

History

[edit]
Interior of the tunnels

A bypass was proposed to be constructed to replace the 600-foot (180 m) stretch of highway. Beginning in 1958, California began the process to replace Devil's Slide with an inland route over Montara Mountain, known as the Martini Creek Bypass. The bypass bisected a section of McNee Ranch State Park, and was opposed by community and environmental groups. By 1975, 55% of the right-of-way had been acquired, when work on the proposed bypass was abandoned due to public opposition.

Most environmentalists supported a tunnel as a more environmentally sensitive alternative to the Martini Creek Bypass. A short tunnel built in 1908 by the Ocean Shore Railroad went through the area, but was destroyed during Prohibition, to keep it from being used by alcohol smugglers. The Sierra Club proposed building a tunnel to bypass the road in 1973. A Caltrans study in 1974 determined that a tunnel would be a viable alternative to the current road or a proposed inland freeway bypass. However, the state dropped the idea in the late 1970s.

A major slide in 1983 brought the problem to the public attention again. In 1985 Caltrans proposed the Martini Creek bypass as the preferred solution. However, the Sierra Club sued to stop construction, as California law requires that State Route 1 be restricted to two lanes in rural areas. The 101-foot-wide (31 m) road bed, complete with continuous uphill passing lanes, runaway truck ramps, and extra-wide shoulders, would be the widest two-lane road in the state. Again the state decided to return to the status quo.

A five-month outage caused by a slide in January 1995 again brought public scrutiny to the stretch of highway. In April, Caltrans documents were discovered that showed the agency had intentionally overestimated the costs of a tunnel, to support the freeway bypass. In July, the Federal Highway Administration ordered Caltrans to re-evaluate a tunnel to bypass Devil's Slide. On November 5, 1996, San Mateo County voters approved Measure T by 76%, changing the county's stated preference from construction of the bypass to construction of a tunnel. On November 9, Caltrans changed its position, supporting a bridge and tunnel as the best environmental, economic, and popular alternative to Devil's Slide.

Ground was broken for the new tunnel on May 6, 2005. Boring of twin 30-foot (9 m) diameter tunnels started September 17, 2007, and was completed in 2011.[1] Breakthrough on the northern bore occurred on September 30, 2010.[2] With the completion of the tunnels in 2013, the old Devil's Slide highway was converted into a trail for hikers and bicyclists.[3] The tunnels opened to traffic on March 26, 2013.[4]

References

[edit]
  1. ^ Michael Cabanatuan (4 August 2011). "Devil's Slide tunnel work falls behind schedule". The San Francisco Chronicle. Retrieved 21 March 2013.
  2. ^ Lily Bixler (14 February 2012). "Workers break through tunnel preemptively". The Half Moon Bay Review. Retrieved 21 March 2013.
  3. ^ Ryan Kim (May 6, 2005). "SAN MATEO COUNTY / Tunnel was devil of a fight / Caltrans breaks ground today on long-sought bypass at notorious slide". The San Francisco Chronicle. Retrieved 21 March 2013.
  4. ^ Michael Cabanatuan (14 March 2013). "Devil's Slide Tunnel to open March 26". The San Francisco Chronicle. Retrieved 21 March 2013.

Further reading

[edit]
  • Michael Hogan and Ballard George, Air Quality and Noise Analyses for the Bypass Alternative, Devil's Slide Improvement Project, Caltrans District 4, prepared by Earth Metrics Inc., Burlingame, CA (1984)
  • Devil's Slide Improvement Project, San Mateo County, California, Draft Second Supplemental Environmental Impact Statement, Caltrans District 4 (1999)
  • Hovland, John H., Ph.D., P.E., A Study of the Feasibility of Stabilizing the Landslide Area Along Highway One, San Mateo County, California, by Dewatering, April, 1998
  • Woodward-Clyde Consultants, Devil’s Slide Tunnel Study – Feasibility Report, October, 1996.
[edit]